How much does a 100 sq ft bathroom remodel cost in Tigard, OR?
| Typical total$311 per ft² of bathroom | $31,141 |
|---|---|
| Range you should see in bidsthree bids on the same scope normally land inside this | $17,966 – $53,898 |
| Labor portion50% of the job — this is the part that moves by city | $15,570 |
| Material portion50% — bought at national prices | $15,570 |
| Plumbers, Pipefitters, and Steamfitters pay near Tigardabout $48/hr · Portland-Vancouver-Hillsboro, OR-WA metro | $100,710/yr |
| U.S. mean for the same tradeSOC 47-2152 | $72,170/yr |
| Versus the national pricetrade pay here runs +39.5% against the U.S. mean | +$5,141 |
Notes
- Where the number comes from. The national price for a full bathroom remodel is $260 per ft² of bathroom — full bathroom remodel pricing published for 2026, $150–$450 per ft² of bathroom. Labor is about 50% of that. Plumbers, Pipefitters, and Steamfitters near Tigard, OR average $100,710 a year against a U.S. mean of $72,170 — a factor of 1.395 — so the labor half is scaled by that and the material half is not. Source: BLS OEWS May 2025 for the Portland-Vancouver-Hillsboro, OR-WA metro area, SOC 47-2152.
- Why the city matters, not just the state. Trade pay moves inside a state as much as it does between states. Crews do not commute across a state to bid a job, and materials ship at national prices either way — so a metro wage is the honest input here and a state average quietly rounds four different cities into one number.
- What is in the price: demolition, new tub or shower, toilet, vanity, tile to the walls and floor, waterproofing, lighting, fan, paint and labor.
- What is not: moving any fixture from its existing position, structural changes, a window, and asbestos or lead work in an older house. These are the lines that turn a $31,141 quote into a $38,926 invoice, so ask about each one before signing.
- Use this as a bid check, not a quote. It prices an average job in average condition. Difficult access, the state of what is being replaced, the season, and a crew booked out three months all move the real number, and none of them are in a per-unit average.
a full bathroom remodel in Tigard, OR
$31,141 is the typical number, and three bids on the same scope normally land between $17,966 and $53,898.
That is $5,141 more than the same job priced at the national average.
Why the city changes the number
About 50% of this job is labor — $15,570 of the $31,141 above. Labor is the only part that moves locally; a bundle of material costs what it costs wherever it is nailed down.
Plumbers, Pipefitters, and Steamfitters near Tigard average $100,710 a year, against a U.S. mean of $72,170. That is a factor of 1.395, so the labor half is scaled by it and the material half is not.
Source: BLS OEWS May 2025 for the Portland-Vancouver-Hillsboro, OR-WA metro area, SOC 47-2152.
What the quote should include
The lines that turn a quote into an invoice
Ask about each of them before you sign. On a job this size they are the difference between $31,141 and something a quarter higher.
Use it as a bid check, not a quote
This prices an average job in average condition. Access, the state of what is being replaced, the season, and a crew booked out three months all move the real number, and none of them are in a national average.
If a bid lands outside $17,966 – $53,898, that is not automatically wrong — but it is the question worth asking out loud.
Nearby sizes
- How much does a 100 sq ft bathroom remodel cost in Grand Island, NE?
- How much does a 100 sq ft bathroom remodel cost in East Honolulu, HI?
- How much does a 100 sq ft bathroom remodel cost in Caldwell, ID?
- How much does a 100 sq ft bathroom remodel cost in Monroe, LA?
- How much does a 60 sq ft bathroom remodel cost in Tigard, OR?
Read more
- What Drives a Bathroom Budget — Fixture Count, Not Floor AreaDoubling the floor area barely changes the cost. Adding a second sink and moving the toilet changes it a great deal.
- How Long a Bathroom Takes — Most of It Is WaitingThe working days in a bathroom remodel number about ten. The elapsed weeks are three times that, and the gap is what surprises people.
- Where to Spend and Where Not To — Behind the Wall Beats On ItAnything that can be replaced in an afternoon is a candidate for saving. Anything behind tile is not.
- What to Do Yourself — Demolition and Paint, Not WaterproofingHomeowner labour is worth most at the start and at the end of a bathroom, and worth least in the middle.