Cost to move a bathtub 3 to 6 ft on a concrete slab
| Cost to move it | $2,000 – $6,600 |
|---|---|
| Same move on a wood floor, short distancethe cheapest version of this move, for comparison | $650 – $2,100 |
| Fixturedrain and overflow, and the tub itself has to come out either way | a bathtub |
| Floorcut, break out, re-plumb, backfill and re-pour — a different trade on top | a concrete slab |
| Distancelikely crosses a joist — headers or a re-route | 3 to 6 ft |
| Multiplier against the base | 2.2× |
Notes
- This is an adder, not a price for the work. It is what moving the fixture costs on top of the fixture itself, the tiling, the waterproofing and the finishes. A layout change that moves three fixtures stacks three of these.
- Moving a bathtub is one of the cheaper changes, because the drain is small and the slope requirement is easier to satisfy over a short run. If the layout has to change, moving this rather than the toilet is where the money is.
- A concrete slab roughly doubles it, and it is a second trade. The floor has to be cut, broken out, the pipe re-run, backfilled, and re-poured — then the new concrete has to cure before tiling. That is days of programme as well as money, and on a post-tension slab it may not be permitted at all without an engineer locating the cables first.
- At 3 to 6 ft the run usually stays simple, which is why this is the version of the change worth designing toward.
- Keeping the layout is the single biggest saving in a bathroom remodel. New fixtures in the existing positions, with new tile and a new vanity, produces most of the visible change for a fraction of the plumbing cost. It is worth pricing both versions before falling in love with a drawing.
- Ask what happens if the existing drain is cast iron. Older houses often are, and cutting into it means transition couplings and frequently discovering the rest of the line is worse than expected. That is the most common mid-job surprise on this work.
$2,000 – $6,600 — and it is an adder, not the job
That is what moving a bathtub costs on top of the fixture, the tile, the waterproofing and the finishes. A layout change that moves three fixtures stacks three of these.
Why the toilet is the expensive one
A basin needs a 1½ inch drain that can run almost anywhere. A toilet needs a 3 inch drain holding ¼ inch of fall per foot, plus a vent.
Every foot further from the stack drops the pipe another quarter inch. Ten feet of travel is 2½ inches of drop, and it has to fit between the top of the floor and whatever is below.
That is the point where "we can move it, it just costs more" becomes "not in that corner". Slope is a hard constraint, not a budget one.
The floor decides the multiplier
A joist floor means the plumber works in the joist bay, and how easy that is depends on access from below. An unfinished basement underneath and the bathroom floor barely gets touched.
A concrete slab means cutting, breaking out, re-plumbing, backfilling and re-pouring — a second trade, days of programme, and the new concrete has to cure before anything is tiled. On a post-tension slab it may not be permitted at all until an engineer has located the cables.
The saving nobody wants to hear
Keeping the existing layout is the single largest saving available in a bathroom remodel. New fixtures in the same positions, with new tile and a new vanity, delivers most of the visible change for a fraction of the plumbing cost.
Price both versions before committing to a drawing.
Ask what happens if the drain is cast iron
Older houses often are. Cutting into cast iron means transition couplings, and it frequently means discovering the rest of the line is in worse condition than anyone assumed. It is the most common mid-job surprise on this work, and it is worth asking about before demolition rather than during it.
Nearby sizes
- Cost to move a shower 3 to 6 ft on a concrete slab
- Cost to move a toilet 3 to 6 ft on a concrete slab
- Cost to move a vanity 3 to 6 ft on a concrete slab
- Cost to move a bathtub under 3 ft on a concrete slab
- Cost to move a bathtub over 6 ft on a concrete slab
- Cost to move a bathtub 3 to 6 ft on a joist floor
Read more
- Moving Plumbing — The Drain Is the Expensive HalfMoving a sink three feet is a morning. Moving the toilet three feet can mean opening the floor and reworking the vent.
- Toilet Rough-In — 12 Inches, and the Clearances Around ItBuying a toilet without measuring the rough-in is the most common ordering error in a bathroom, and it is a returned toilet rather than a small problem.
- Vanity Height — 32 Inches Was for 1950, and It ShowsMost people bend to use a standard-height vanity, and the taller version costs the same.
- Shower Valves — Choose the Brand Before the Tile, Not AfterThe most expensive small mistake in a bathroom is a valve body from one manufacturer and a trim kit from another.